Checklist: preparing a site for handover cleaning

A smooth handover clean starts before our team arrives. This checklist helps you, as a site manager or developer, ensure the cleaning runs perfectly on the agreed day — without wasted hours or extra costs.

1. Remove coarse debris & waste

  • Dispose of large construction waste (drywall, insulation, wood) in a container.
  • Remove packaging material, plastic film and empty paint buckets.
  • Peel off stickers from windows, doors, sanitary ware and appliances before cleaning.
  • Remove protective film from floors and stairs or clearly mark it.

2. Water & electricity available

  • Working tap on every floor (hot water not required).
  • At least 2 active power outlets per zone for vacuum cleaners and machines.
  • Working lighting in all rooms – including basement, storage and technical rooms.
  • Elevator operational for projects with multiple floors.

3. Access & planning

  • Provide keys, badges or door codes in time (ideally 48h in advance).
  • Provide a parking spot for the van close to the entrance.
  • Other contractors kept off site during cleaning (no overlapping work).
  • Communicate a clear handover date so planning is watertight.

4. Finishing checked before cleaning

  • Paint and filler work fully dry and finished.
  • Silicone and sealant joints cured (min. 24h).
  • Sanitary ware, kitchen and appliances installed and connected.
  • No outstanding work items left in the areas to be cleaned.

5. Share specific points of attention

  • Flag delicate materials (natural stone, solid parquet, designer taps).
  • Specifically name rooms that do NOT need cleaning.
  • Extra requests: inside cabinets, exterior windows, terrace or garage.
  • On-site contact person with phone number for the day itself.